公司新闻

Another Project of DANIELI passed the inspection and ready for delivery

浏览次数 : 7331
更新时间 : 2019-08-06 19:57:57

 

Another Project of DANIELI passed the inspection and ready for shipment

        Today, another batch of stave coolers for Danieli has just been released from production and passed all the inspection process operated by Danieli inspectors. The products now are ready for shipment. The staves will be installed into the Ural Steel blast furnace No.2. in Novotroitsk, Russia.

          Since the start of cooperation with Danieli Corus, Tianyu has built a close partnership with the company by reliable quality and integrity service. We deeply believe that Tianyu will continue to provide long life cooling equipment for metallurgical industry in the future.

Cast Iron Stave Cooler, Water-Cooling Converter Mouth, Cast Iron Tuyere Cooler, Cast Copper Tuyere Cooler, Chequer supports, Cast Iron Water Jaker stave cooler cooling stave cast iron stave cooler blast furnace stave cooler blast furnace cooling stave cast iron cooling stave

 

关联 新闻
查看更多 >>
为台塑越南项目提供可靠交付 | 生产透明,成效可见 为台塑越南项目提供可靠交付 | 生产透明,成效可见
Jun .27.2025
我们自豪地完成了一项重大交付——在集中的三个月内,为台塑集团(越南)亚洲最大的工业集团之一,提供了一批高炉生铁冷却壁。
从挑战到合作:国际铸造合作的真实案例 从挑战到合作:国际铸造合作的真实案例
Jun .25.2025
在 METEC 2023 上,我们与高炉领域的长期工程合作伙伴重新建立了联系。
在冶金冷却设备中,没有唯一的答案——只有适合每个部件的正确工艺。 在冶金冷却设备中,没有唯一的答案——只有适合每个部件的正确工艺。
Jun .11.2025
在生产过程中,我们遵循一个原则:让铸造工艺服务于设计,而不是相反。
我们如何可靠地完成交付 我们如何可靠地完成交付
Jun .11.2025
在天宇,我们相信精密设备值得精密包装——在制造单个板条箱之前就开始了。